Monday, November 5, 2007

The blessing of windows





As I mentioned previously, We were given three 4x6 picture windows. Two of these we installed in the living room, they are flanking the future fireplace/hearth for the Kuma stove we hope to purchase. The third is horizontal in the kitchen, making a nice seating area with a view.


The two front windows are Pella windows, much like the ones in my parents house, with a picture window in the middle and opening windows on each side. We bought these used three years ago. They have blinds inside the glass. The highlight of all the windows are the two sets of french doors, one for the dining room and one for the Master bedroom.


Installing a window in a log house means first cutting the proper size hole in the wall with the chain saw. this must be precise, which is difficult with a chainsaw, you must make sure the chain is sharp. Secondly, the hole must be chiseled and sanded to be exactly level and perfectly sized for the frame that must be built to go around the window itself. The third is building the frame. We used 2x12, nailed it together, then screwed it into the log wall with lag screws after making sure it was square and level. Next, we made quarter round with the router and table saw, using the chop saw for the angled corners. We glued and nailed this to the edge of the frame. Then, after spreading window sealant around it was finally time for the blessed glass itself! But, before we could stand back and admire, we needed to nail more quarter round on the inside of the frame, securing the window in place. Eventually, there will be molding to go around the frames, but for now, there is just tons of foam insulation. It such a wonderful feeling to get another window installed, each one is a thrill, as the house starts to take shape and we imagine what the rooms will look like. We envision watching deer out the living room windows, throwing open the french doors in the summer for an evening of hospitality in the fresh air, and taking in the beautiful woods that surround Providence Lodge. Aaahh, it's a good feeling.

Saturday, October 27, 2007

chinking nightmares





We finally began the chinking process, using a mix of lime, water, and morter mix. The result is a consistancy of peanut butter. After several long hard days, I began chinking in my sleep, that is, dreaming I was still chinking. No wonder I woke up so sore!! Chinking is very hard work, at least for a middle aged mommy. The younger help would fill the gap with mortar, then I would come along behind them and smooth it to look, well, as pretty as cement can be.
Everyone got in on the job, with such a big job, and the threat of winter over our heads, anyone who volunteered was quickly put to work. (Thanks a million Matt and Terry!) In the meantime, Brian and I are installing windows, mostly on the days that are too icky to be chinking. The two big windows in front were bought used three years ago, the two big living room windows were given to us. we have another one just like it to put in the kitchen seating area. With the windows and insulation, it is quite cozy inside. We think it is looking like home.

We must say a special thanks to Nanny and Anna who kept the home fires burning and the little ones occupied during the two weeks we really buckled down to get this job done. Our children
John, Rose, and Joe really worked hard. We couldn't do it without them, nor would we want to, you guys are great!




Thursday, September 27, 2007

The flooring battle





As summer is ending, and we haven't spent much time working on the lodge, we planned a few weeks "vacation" from the ministry to devote to getting the flooring (and hopefully chinking) done before the rains and winds of fall ruin our lumber.


We bought a pine/spruce 2x6 tongue and groove to do the floors with, largely because the fir we desired was too expensive. So, in the end, we found the soft wood to look fine, but be a bear to install, as it had so many twisted boards per unit, that culling it out to #1s, 2s and 3s, left a bigger 3 pile than the 1s or 2s.


The Ross family, from SPUR HARDWOOD came out and showed us how to install the flooring with the tricks of the trade, then, the Ross's stayed and helped with their "young man" power.(Thanks Steven and Alex!)


We stained the beveled side the same "natural" stain as we used on the outside of the house and the floor joists. We also choose specific boards to go in front of the main door and down the hall. Brian was incredible with the coving around the log collumns, using a coving comb. Stan, aka Grampy, stayed three weeks helping us out all over, mostly chop saw man. Anna, Rose, Joe, Mama and John all got in on the work too, Daddy called us girls "squirel power", Joe- Glue Boy, and Bethany a cross between monster and little llamb, depending on the day. :-)

Monday, July 30, 2007

Floor Joists Going Up



It has been just about a month since we have been able to get out to our property and work on the house. Today we had John and Rose hammering chinking nails, Anna home with the little ones until lunch time, and Brian and Julianne hoisting 4x10 floor joists up to the 2nd floor girders via block and tackle. We got a pretty good system worked out here. The block and tackle hung from a perlin. The rope that wound around the joist and hooked onto the B&T would slide along the beam so we had our son John tack on some 12” boards with a gap just big enough for the rope. Next, Brian pulled and Julianne used a long board to guide the joist into the right place. This long board had a nail tacked in that helped to get the rope off the joist from the floor instead of climbing a ladder each time. Then Brian would use the board to shift the joist down the log girder until it was in the right place. We had one slip off the girder on one side and come crashing down. That was frightful, so were extra careful after that to not let it happen again. We had pretty much used this same system to get the third floor joists up, which had to take place prior to the second floor, of coarse, the only difference was we had to have someone up on the third floor girder to help the joist into place. I am continually amazed at how beefy these joists are. T&G flooring is next, in fact, it is sitting right out the door waiting for us. We have to stain the undersides before installing, and will sand and stain the floors after they are all in. It will be so exciting to be able to walk around all the floors in the house and admire the views, plan the rooms, lay out the windows, and dream of how it will all look when it is DONE, which is: hopefully before Jesus returns, or possibly Christmas.

Living Counter Cultural: Femininity

Popular culture has a decidedly feminist bent.  Recent movies, tv shows and prominent women  are displaying heroins as   to...